How to Inspect Access Equipment Before Work Starts

A boom lift arriving on time does not make it ready for use. Before anyone leaves the ground, the machine, work area and planned task must all be checked together. Knowing how to inspect access equipment gives site teams a practical way to identify faults early, prevent unsafe use and avoid losing a shift to an issue that should have been found before work started.

For contractors, facilities teams and project managers, this is not a paperwork exercise. A proper pre-use inspection protects operatives, people below the work area, the programme and the equipment itself. It also provides a clear record that the machine was checked by a competent person before it entered service.

Start with the correct equipment and documentation

Inspection begins before the platform is started. Confirm that the machine delivered is suitable for the job: required working height and outreach, safe working load, ground conditions, access route, space for outriggers where applicable, and any restrictions from overhead services or neighbouring property.

A compact tracked spider lift may be the right answer for restricted access and sensitive ground, while a lorry-mounted platform can provide efficient reach for highway-facing work. The inspection process is similar, but the risks are not identical. For example, outrigger set-up is central to the safe use of many lorry-mounted and spider platforms, whereas a self-propelled boom lift needs particular attention to its travel route, slope limits and ground bearing capacity.

Check that the relevant documentation is present and current. This normally includes the operator’s manual, pre-use inspection records, maintenance information and evidence of the required thorough examination. Under LOLER, lifting equipment used to lift people requires thorough examination at the appropriate intervals, commonly every six months unless a written examination scheme states otherwise. PUWER also requires work equipment to be suitable, maintained and inspected where necessary.

A current thorough examination certificate does not replace the daily check. It confirms the equipment has been examined at scheduled intervals; it does not confirm that a hose has not been damaged, a tyre has not lost pressure or a control has not developed a fault since the last use.

How to inspect access equipment before each shift

The pre-use check should be completed by a trained, authorised operative before the machine is used, after a change of shift and following any incident that may have affected its condition. Use the manufacturer’s checklist for that model rather than relying on memory alone.

Begin with a slow walk-around while the machine is switched off and, where necessary, isolated. Look for obvious damage, loose fittings, missing components, leaks, fluid levels and signs that the equipment has been struck or misused. Good lighting matters. A small hydraulic leak or damaged cable can be missed in poor conditions and become a much larger problem once the platform is elevated.

Pay close attention to the following areas:

  • Structure and platform: Inspect the boom, scissor arms, chassis, turntable, basket, guardrails, gate, toe boards and anchor points. Look for cracks, bends, corrosion, unauthorised welding, missing pins or damaged welds.
  • Hydraulics and running gear: Check hoses, cylinders, fittings and the ground beneath the machine for leaks. Inspect tyres or tracks for cuts, excessive wear, damage and correct condition. On machines with outriggers, check pads, beams, locks and interlocks.
  • Controls and safety devices: Test ground and platform controls, emergency stop buttons, emergency lowering, alarms, limit switches, tilt warning systems, load sensing equipment and emergency descent arrangements in line with the manufacturer’s instructions.
  • Power and consumables: Check fuel, oil, coolant, hydraulic fluid and battery condition where applicable. For electric platforms, inspect charging leads and connectors. Do not use damaged electrical equipment or extension arrangements that are not suitable for site conditions.

The machine should then be function-tested from the ground in a clear area. Confirm that movements are smooth and controlled, that the emergency functions operate, and that there are no unusual noises, warning lights or fault codes. Test platform controls only once it is safe to do so and the area is controlled.

Never bypass an interlock, silence an alarm or improvise a repair to keep the job moving. These systems are there because stability, overload and entrapment risks can develop quickly at height.

Inspect the work area, not just the platform

A machine can be in excellent condition and still be unsuitable for the location. Before positioning it, assess the route to the work area and the ground on which it will operate. Consider slopes, potholes, trenches, basements, service covers, soft verges, recently backfilled ground and underground services. Rain can change the condition of grass, made ground and unsealed surfaces within hours.

Where outriggers are used, make sure the ground can support the imposed loads. Spreader pads may be required to distribute pressure, but they only help when selected and positioned correctly. Do not set up over voids, weak covers or ground of unknown bearing capacity.

Look above the machine as well. Overhead power lines require careful planning, exclusion distances and, in many cases, arrangements with the network operator. Branches, building projections, gantries, signs and scaffold can create crush or entrapment hazards. If work is near a public route, establish barriers and traffic management before elevating the platform.

Weather also affects the decision to work. Wind limits are stated by the manufacturer and must be followed, but wind speed is not the only consideration. Gusts around tall buildings, poor visibility, lightning, ice and heavy rain can all make work at height unsafe. A platform rated for outdoor use is not automatically safe in every outdoor condition.

Make the operator and task part of the check

The person using the platform must be familiar with that category and model of equipment. Formal training is essential, but site-specific familiarisation is equally valuable when controls, emergency systems or operating characteristics differ between machines.

Before work begins, agree the task method with the operator and ground team. Confirm who will act in an emergency, how they will communicate, where the rescue plan is kept and whether someone on the ground can operate the emergency controls. A rescue plan that depends on waiting for the emergency services is not enough for most work-at-height activities.

Check that the platform will not be overloaded by people, tools or materials. Include the weight of attachments and consider how items will be secured. Long materials can affect movement and create a striking hazard even when the stated load capacity has not been exceeded. Do not use guardrails as a support for ladders, steps or makeshift extensions.

Personal fall protection must match the manufacturer’s guidance and risk assessment. Some MEWPs require a restraint lanyard attached to the designated anchor point, while the correct arrangement can vary by machine type and task. The aim is to prevent a person leaving the platform, not to create additional risk through unsuitable equipment or poor adjustment.

Record defects and remove unsafe equipment from use

If an inspection identifies a defect, stop and assess it. Minor cosmetic marks may not affect safe operation, but that judgement should be made by a competent person with reference to the manufacturer’s guidance. Hydraulic leaks, damaged rails, faulty controls, missing safety devices, structural damage and unexplained warning alarms are not defects to monitor while work continues.

Clearly label or isolate equipment that is not safe to use, report the issue immediately and arrange repair through the equipment owner or a competent maintenance provider. Accurate defect reporting helps technicians diagnose the issue and prevents another operative from unknowingly taking the machine into service.

For hired access equipment, report concerns promptly rather than attempting site repairs. A dependable hire partner should provide clear handover information, responsive technical advice and maintenance support when circumstances change. JBL Group’s friendly, experienced team can also help assess whether the selected platform remains the right solution for the site and task.

Keep inspections practical and consistent

The strongest inspection routine is one that is completed properly on every shift, not one that looks impressive in a folder. Give operatives enough time to carry it out, use a model-specific checklist and encourage them to report concerns without pressure to keep working. Supervisors should review records, particularly where equipment is used across multiple shifts or changing locations.

If conditions, scope or positioning change during the job, pause and reassess. A new delivery route, worsening weather or a revised work face can alter the safe method of work. Treat the inspection as part of active site control, and it will do more than satisfy compliance requirements – it will help the work continue safely and without avoidable disruption.